We have done some preliminary studies regarding traffic control through the corridor. It won’t necessarily be sequential from south to north, nor will it be done all at once.
There will be certain sections that are easier to work on because we do have to maintain two lanes of U.S. 1 traffic through the corridor at all times, during high traffic times, peak hour times, and sometimes during the daytime hours.
The project will be a little more patchwork. It will be completed in as big of sections as possible to be convenient and more efficient for the contractor.