This is being discussed with the municipalities and the public officials. Multiple forms of connections will be made to create a 4-mile loop that runs from Highland Avenue at the south end and loops along the existing service roads up to the Route 413/Pine Street connections with the proposed sidewalk. The potential loop provides various connections in areas where service roads are removed. A service road that needs to be maintained would be established on the shoulder. The road stretches north to the existing sidewalk. This project references the Bucks County Bicycle and Pedestrian master plan that was previously created, along with other references and studies, as a basis for the concept.