1) Maple Avenue interchange with US 1 will remain as it currently is. That was reconstructed in 2014 and will remain open also. We are just connecting that with an auxiliary lane which just essentially means it will be a weave lane between the 213 interchange and the 413 off ramp interchange. So, you would still enter Route 1 from 213, Maple Ave.
2) 2029 is the current anticipated construction start with a 3-year construction duration which would end in 2031.