Construction Schedule
The project includes the reconstruction and widening of U.S. 1 from North of the PA Turnpike to North of the CSX/SEPTA RR. The project incorporates the construction of three (3) U.S. 1 Mainline bridges over SR204 (Rock Hill Drive), Neshaminy Creek, and the CSX/SEPTA RR. The project involves the installation of a sound barrier wall, ten (10) sign structures, three (3) retaining walls, and placement of a stormwater system and environment control measures project-wide. The U.S. 1 Section RC2 will be completed in nine (9) stages.