- A 10-foot-wide sidepath is proposed along the east side of PA 413 (Pine Street), and a 5-foot-wide sidewalk is proposed along the west side of PA 413 (Pine Street) within the project limits to connect the existing sidewalks north and south of the project.
- 5-foot-wide paved shoulders will be provided on the West Interchange Road and Corn Crib Lane overpasses.
- In areas where the existing frontage (service) roads are no longer needed, the design team is investigating replacing the existing pavement with a shared-use (pedestrian and bicyclist) path. This is being done in coordination with the local municipalities. As of now, Middletown Township has voiced its support for including a shared-use path, while Langhorne Manor Borough has requested not to have the path within their respective boundaries.
Based on these discussions, the anticipated proposed project improvements, along with recent guidance from the U.S. Department of Transportation (USDOT), PennDOT, and the FHWA concluded that the environmental study for Section RC3 would be an Environmental Assessment (EA), as the significance of the impacts was not yet fully known.
During the past several years, the project team has been completing the necessary environmental and engineering studies, coordinating with the various review agencies, conducting municipal and public outreach efforts, developing impact assessments, and identifying avoidance, minimization, and mitigation efforts for the project.
PennDOT will be using this information to prepare the EA documentation and will make this material available for public comment prior to finalizing the environmental process for this project, currently anticipated in Fall 2025 / Winter 2026.
- *Publication 10B – Design Manual Part 1B (Post-TIP NEPA Procedures)